Setting Up The Foundation Forms by Christian Education Center | Jul 10, 2019 | Construction Kerry cutting a styrofoam block to size with Ken assisting. Wayne laying a second course styrofoam block. Andre and Dean assessing the fit of a trimmed block. Isaiah helping prepare the footing for the laying of the styrofoam blocks – Kerry tutoring in the background. Jobsite at the end of a successful fun day of work – 6 courses of styrofoam block laid! (Wayne and Joe walking by) Mike cutting the styrofoam blocks. Maria (and Isaiah on the outside) fitting in a 4th course styrofoam blocks. Dean and Andre holding up the door frame. Kerry discussing futures plans using the blueprint after 6 courses of styrofoam block have been laid Andre measuring and Dean cutting a block to fit. Dean Cutting the styrofoam blocks. Emily tying off rebar which will give strength to the walls when the cement is poured. Kerry, Mike, and Scott connecting the first and second course of block. Joe carrying a block for the second course. Isaiah and John carrying styrofoam blocks. Mike installing the styrofoam blocks. Sunday, July 7 was a beautiful day at the CEC property as a team of dedicated lay persons assembled to put up the styrofoam/cement wall for the new Multipurpose Building. Kerry is explaining the proper way to join the stryofoam blocks together to make a perfect fit and strong walls.